LONGi: Dressing the New Workers’ Stadium with a New Look
The 2023 Argentina vs Australia International Football Invitational will kick off at 20:00 on June 15 at the Beijing Workers’ Stadium. Notably, the completion of the new Workers’ Stadium coincides with the visit of Argentine football legend Lionel Messi to China.
This match marks the First overseas appearance of the Argentina national football team led by Messi after winning the 2022 World Cup. Australia, a strong Asian football side, faces the Albiceleste once again following their Round of 16 clash at the Qatar World Cup. The new Workers’ Stadium makes its debut, presenting itself to the world with a brand-new look. Boasting the largest building-integrated photovoltaics (BIPV) roof for a sports venue in China, LONGi’s Longjin products stand out as one of the biggest highlights of the renovated stadium.
Beijing Workers’ Stadium, often shortened to “Workers’ Stadium”, is located in the heart of Beijing, China’s capital. Since its completion in 1959, it has served as an important venue for sports and entertainment in China and holds a special place in the hearts of countless Chinese people. It has witnessed the evolution of Chinese sports and the youth and dreams of generations.

As history moves forward and the times keep progressing, the Beijing Municipal Government launched the renovation and reconstruction project of the Beijing Workers’ Stadium in 2020 to better meet the needs of modern urban development. The project covered the internal and external structures of the stadium. LONGi supplied 351kW PV modules for the newly added roof curtain wall, which are installed around the stadium roof in a shape resembling a “golden collar”. While supplying part of the power for the venue, the modules also deliver the benefits of aesthetic appeal, energy efficiency and environmental protection for the building curtain wall.

Adhering to the mission of “safe and reliable, customizable colors, green building materials”, the LONGi team fully deployed Longjin products to meet personalized architectural requirements while satisfying aesthetic standards, and finally delivered customized PV modules in multiple sizes. The products are installed with concealed curtain wall frames and arranged like louvers on ventilated fixed wings. The open aluminum cladding panels facilitate ventilation and heat dissipation. The total installation area reaches 3,712 square meters with an installed capacity of 351kW, delivering a carbon emission reduction of up to 4,930 tons over 25 years.

Original article from LONGi
LONGi’s “Green Electricity + Green Hydrogen”